2007 - 2009

Project Control Manager for Total E&P – Russia, in Moscow for Khariaga Field Development, Phase 3 Project. Brownfield Project, in Polar conditions, consisting of Pipelines (40 km, Oil, Gas and Water Injection), New Pads, extension of existing Central Process Facilities.

Industrie
2007 - 2007

Commissioning Manager for ABAN Offshore Ltd. on the Aban – Abraham Drillship project, Refurbishment and Upgrade of the Dynamically positioned drillship previously named Pelerin or Pelegrin III in Singapore, Sembawang Shipyard.

Industrie
2005 - 2007

Project Control Manager for Total – Yemen LNG Pipeline Project in Oman Muscat and later in Yemen, Saana. Project of 320km Gas Pipeline (38”) in desert and mountain area.

Industrie
2005 - 2005

Senior Contract Engineer for Total E&P UK, Aberdeen, responsible for drilling and logistic contracts of the Total UK branch.

Industrie
2003 - 2004

Kizomba “B” Drilling Rig Project Manager for Pride International, Johor Bahru, Malaysia.
Construction and Hook Up of a new Drilling Rig designed for Kizomba “B” TLP, 2 modules of 2,000t.

Industrie
2003 - 2003

Deputy Project Manager, Hook Up Manager in Rotterdam for Kizomba “A” Drilling Rig.
Hook up of the partially built Drilling Rig on top of the Kizomba “A” TLP, completion of the project including full commissioning and Site Integration test.

Industrie
2001 - 2003

Project Control, Planning and Risk Manager for the construction of several Offshore Drilling Rig as Holstein Spar (BP), Mad Dog Spar (BP), Kizomba “A” TLP (ABB/Exxon)

Industrie
1998 - 2001

Planning Manager on different Oil & Gas Project including
the construction of two Ultra Deepwater Drillships, Pride Africa & Pride Angola in South Korea (Hyundai Mipo Dockyard) for ELF Girassol, Secondment to Pride Foramer. Fast track project, 14 months of construction
and
Extension of the Condamine Port – Principality of Monaco, for the completion of an embankment of 10,000 m2, a 352m long, 28m wide semifloating dyke. 28 months project for a total budget of 1,6 billion francs.

Industrie
Ancien élève de

Les visiteurs de ce profil ont aussi consulté
Thomas Daneels
Consultant Clos Couvert - Gérant, TENAGA Etudes
Flavien Caudron
Project engineer, Total E&P Russie
Cedric AUPLAT
Directeur Général Délégué, Tifany Industries - Président Tifany Emballages
Hervé Baron
Project Control Manager, Technip
Matthieu Escande
Member of the Advisory Board, Betforce
Cedric Mossaz
PRODUCT SOURCING DIRECTOR, DANONE PRODUITS FRAIS
Пётр Караганов
Кладовщик, Миратогр
Lyudmila Baturina
Директор, Rocssa
Артур Кошелев
Руководитель, НооКом